×

Get in touch

Home >  Applications

Set a record of lifetime- Weiye 26-3HF well

Share
Set a record of lifetime- Weiye 26-3HF well
Overview

High mud density and pump load, the adjacent well meet continuous problems due to the competitor’s PDM failure, and customer ask for long life time PDM  that at least 300 hours.

Solution

DeepFast recommend low-pressure MSS6757845-II PDM

Performance

Satisfied customer‘s requirements, compared with conventional PDM, the pressure consumption was reduced by 2MPa, the output speed was stable, continuous working time was 417.66 hours, the footage was 2128m, and the ROP reached 9.56m/h


tptp (3)


No WELL No TYPE M.W. g/cm3 Interval/m FTG/m Circu. Time/h Drilling Time/h ROP m/h Remarks
1 WY26-4HF High temperature oil-based 2.14 3306-5236 1903 279.48 159.72 11.91 The fastest ROP
2 WY26-3HF High temperature oil-based 2.15 3312-5440 2128 417.66 222.54 9.56 The longest working time

Prev

TITO SS5007835 PDM with ZERO Failure

All applications Next

None

Recommended Products
email goToTop