Overview

High mud density and pump load, the adjacent well meet continuous problems due to the competitor’s PDM failure, and customer ask for long life time PDM  that at least 300 hours.

Solution

DeepFast recommend low-pressure MSS6757845-II PDM

Performance

Satisfied customer‘s requirements, compared with conventional PDM, the pressure consumption was reduced by 2MPa, the output speed was stable, continuous working time was 417.66 hours, the footage was 2128m, and the ROP reached 9.56m/h


tptp (3)


NoWELL NoTYPEM.W. g/cm3Interval/mFTG/mCircu. Time/hDrilling Time/hROP m/hRemarks
1WY26-4HFHigh temperature oil-based2.143306-52361903279.48159.7211.91The fastest ROP
2WY26-3HFHigh temperature oil-based2.153312-54402128417.66222.549.56The longest working time