×

Get in touch

Home >  Applications

TITO SS5007835 PDM with ZERO Failure

Share
TITO SS5007835 PDM with ZERO Failure
OVERVIEW

The SS5007835 PDM was highly praised by the employer Total and Schlumberger, during 2021 to 2022, more than 100 wells were constructed in Changqing Block and Southwest Block with Schlumberger 4.75" RSS, with an average 35% ROP increased and 0 failure.

 

CNPC Changqing Total Project SN0153-06 well, The Achievement are as follows (serial number 103130):
No.WellInterval/mFootage/mCircu. Time/hDrill Time/hROP m/hRemarks
1SuNan0153-06674-38243150186152.7320.62The longest footage and the fastest ROP
2Yu43-2ZH33174-3706532281.7193.842.74The longest working time
3PengZhou5-3D5870-6158288149.8378.743.66The longest working time
4YunA012-X11-C15720-6284564203.88132.44.26The longest working time

Prev

TITO SS675 PDM -Core Application

All applications Next

Set a record of lifetime- Weiye 26-3HF well

Recommended Products
email goToTop